SPECIFICATIONs

Detail
Aluminium 1050 H14
Mild steel S275
Panel construction
N/A
Panel colour (finish)
Polyester powder-coated to 60 microns or anodised to 25 microns
N/A
N/A
Panel stiffeners
Not Required
N/A
N/A
Vertical support construction
polyester powder-coated (60 microns) or anodised (25 microns). Colour to match panels
N/A
Bracket construction
Hole Size
Min. ø30mm at 40mm triangular pitch
N/A
N/A
Mullion Centres
Panel Width 985mm, Mullion Centres 1000mm
n/a
n/a
Panel Width 1185mm, Mullion Centres 1200mm
n/a
n/a
Panel Width 1285mm, Mullion Centres 1300mm
n/a
n/a
Panel Width 1385mm, Mullion Centres 1400mm
n/a
n/a
Panel construction
Detail
N/A
Aluminium 1050 H14
Mild steel S275
Panel colour (finish)
Detail
Polyester powder-coated to 60 microns or anodised to 25 microns
Aluminium 1050 H14
N/A
Mild steel S275
N/A
Panel stiffeners
Detail
Not Required
Aluminium 1050 H14
N/A
Mild steel S275
N/A
Vertical support construction
Detail
polyester powder-coated (60 microns) or anodised (25 microns). Colour to match panels
Aluminium 1050 H14
Mild steel S275
N/A
Bracket construction
Detail
Aluminium 1050 H14
Mild steel S275
Hole Size
Detail
Min. ø30mm at 40mm triangular pitch
Aluminium 1050 H14
N/A
Mild steel S275
N/A
Mullion Centres
Detail
Panel Width 985mm, Mullion Centres 1000mm
Aluminium 1050 H14
n/a
Mild steel S275
n/a
Detail
Panel Width 1185mm, Mullion Centres 1200mm
Aluminium 1050 H14
n/a
Mild steel S275
n/a
Detail
Panel Width 1285mm, Mullion Centres 1300mm
Aluminium 1050 H14
n/a
Mild steel S275
n/a
Detail
Panel Width 1385mm, Mullion Centres 1400mm
Aluminium 1050 H14
n/a
Mild steel S275
n/a

TESTING & Accreditions

Testing and certification

The Actua® System has been tested for structural integrity, specifically in data centre buildings. In addition to this, Maple is audited by leading accreditation organisations.

iso logo
constructionline gold logo
considerate constructors
chas elite-300x300
Achilles-BuildingConfidence
builders profile logo
firas-logo

DOWNLOADS

ACTUA Brochure

WHY

MAPLE?

Maple Façades has a long history of designing, manufacturing and installing Façades in the construction industry. Through our Proven Process, our dedicated teams ensure data centre projects are installed efficiently through detailed project planning to ensure a safe and high performance across all HSEQ areas.

Installation Efficiency
Capability heading
Exceptional HSEQ
HSEQ-icon
Project Execution Planning
Project-icon

GET IN TOUCH